Amiant Tècnic

Asbestos certificate for selling your property in Barcelona

From 3 October 2026, Law 8/2026 requires proving the presence or absence of asbestos to sell a property in Catalonia. Visual inspection, technical report and certificate signed by a licensed building surveyor, ready for the notary.

What you need to sell with the certificate in order

The process is simple and doesn't depend on having plans or previous records for the property.

1

Contact and basic details

You give me the address, the year of construction, and the timeline you're working with for signing.

2

Visit and visual inspection

I check roofs, downpipes, tanks and other elements that may contain asbestos, with no need for lab samples or works.

3

Report and certificate

I write the document stating presence or absence of visible asbestos, its condition and the associated risk.

4

Delivery for the notary

I send it to you digitally, ready to submit at the sale signing.

Certificate price for a sale

€150 + VAT

Fixed price for homes and premises up to 200 m².

Get a quote

Frequently asked questions about selling

Is the certificate required to sell any property?

Yes, if the property was built before 2002: any sale in Catalonia of a property from before that date requires the certificate from 3 October 2026. Land needs it too. Properties built after 2002 fall outside, as marketing asbestos-containing materials has been banned since that year.

Does it apply only to homes, or also to offices, premises, storage rooms or parking spaces?

It applies to properties built before 2002 that are sold in Catalonia, whatever their type: homes, offices, premises, warehouses, storage rooms, and garages or parking spaces, among others. Land also needs the certificate, like any other property that is sold or rented. Only properties built after that date fall outside this requirement.

What happens if the certificate finds asbestos?

It doesn't block the sale. The certificate reports the material's condition; if it's in good shape and won't be disturbed, it can stay in place. Removal should only be planned if it's degraded.

How long does the whole process take?

The visit is usually scheduled within 24–48 hours of first contact, and you get the certificate the same day as the visit.

Who should pay for it, the buyer or the seller?

As with the energy performance certificate, it's the seller who needs the document, since they're the one who must provide it to the notary.

Can I reuse a certificate from another property?

No. Each certificate is specific to the inspected property, since materials and their condition vary from one home to another.

Selling with asbestos: what you need to know

Specific situations that often come up in a sale, explained plainly.

Does the certificate affect the sale price?

Not automatically. If the report shows the fibre cement is in good condition, in most cases it doesn't affect the negotiation. If it detects deteriorated asbestos, the buyer may factor that into the negotiation, just like with any other element of the property that needs attention.

Can I sell even if the certificate detects asbestos?

Yes. The law requires having the certificate and handing it over, not removing the asbestos before signing. The sale can proceed as normal, as long as the buyer receives the information transparently.

Read more about what happens if there's asbestos →

When should I request the certificate if I already have a notary date?

The sooner, the better. It's usually ready within a week of first contact, but if the signing is close, let me know in advance so I can adjust the visit and report delivery to your schedule.

See the detailed timeline →

Do I have to remove the asbestos before selling?

It's not a legal requirement to be able to sell: the law asks for the certificate, not removal. If the material is badly deteriorated, you can consider prior removal with a specialised company, but that's a decision separate from the certificate.

See when removal makes sense →

Do you have a sale underway?

Tell me the address and your notary deadline, and I'll confirm the visit within 24h.

Get a quote